HOME > Product > Darmatt KM-1
Darmatt KM-1
 
 
 
 
  • The system is based on a patented semi-rigid board, made of ceramic fiber sheets containing a strongly endothermic material which absorbs heat during a fire, creating an effective delay to the heat transfer mechanism.
  • The system is designed for ease of installation and for future removal and replacement, hence avoids contaminated refuses resulting from removal of not reusable materials.
  • Site installation is carried out using a kit of parts that are custom fabricated from site survey.
  • The installed system is durable, weather proof and aesthetically appealing.
 
  • The KM1™ fire barrier partition system has successfully passed fire tests up to 4 hours duration
  • Fire tests are fully compliant with ASTM E119 and the European EN 1363-1 fire-curves.
  • The modular construction means that the KM1™ fire barrier partition can be easily modified to incorporate access door and service penetrations without the need for major construction work. The system is designed for ease of installation and for future removal and replacement.
  • The installed system is durable, weather proof and aesthetically appealing.
 
  • Strong project management and compliance with international quality standards for nuclear.
  • Develop an extensive capability to solve customer problems through engineering, development, testing, installation and manufacturing.
  • Specialize in the design, development and supply of fire barrier systems for primary circuit equipment with contracts on over 100 nuclear reactors.
  • Engaged in the fire protection of cable trays and electrical equipment associated with emergency shutdown systems.
  • Capability for comprehensive engineering and test services.
  • Up to 4 Hour Fire Protection
  • Tested ASTM E119-05 which is larger structure fire test
  • Hose stream test ASTM-E2226-11
  • Lightweight & compact
  • Wall, Partition, ceiling & duct solution
  • Total or partial removability for plant maintenance
  • Can be installed to existing wall or other structures
  • Load calculation and seismic analysis report
 
  • Tests have been carried out at both the Favorable Technology Centre, a NAMAS accredited, internationally recognized fire testing laboratory, our in-house UKAS approved test facility, and independent test facilities in the USA, such as Omega Point and Wyle Laboratories.
  • KM-1 system has passed 1 and 3 hour fire tests in a wide range of boundary and site specific configurations.
  • Fire tests have been UL witnessed and comply with the criteria of: US NRC generic letter 86-10, supplement 1, UL 1724 & ASTM E119.